Parking lots; (Horizontal Marking) Maximum efficiency is aimed by applying car park road lines, direction arrows, wall and ramp scans (Vertical marking), deceleration bumps, column protectors and direction signs at optimum points.
While SY Traffic is preparing parking lot projects, road line work and traffic sign work are done by considering the properties of the material to be used and the regulations of the Municipalities. If horizontal and vertical marking is not sufficient in the parking lot, a traffic signaling project is prepared. In the parking lot, vehicles are guided safely to their destination.